169390€
Show VAT 0%
Show VAT 25,5%
Multitronic Vaasa
Multitronic Pietarsaari
Multitronic Jyväskylä
Multitronic Lappeenranta
Multitronic Mariehamn
Specifications
Description
Store availability
Delivery
Price development
Ports & interfaces | |
Ethernet LAN (RJ-45) ports | 1 |
AC outlets quantity | 24 AC outlet(s) |
Power plug | NEMA L6-30P |
AC outlet types | C13 coupler, C15 coupler, C19 coupler, C21 coupler |
Weight & dimensions | |
Weight | 8.5 kg |
Height | 1829 mm |
Width | 55 mm |
Depth | 46 mm |
Energy management | |
Nominal output voltage | 200 - 208 V |
Nominal input voltage | 90 - 264 V |
Maximum current | 30 A |
Load capacity | 4992 VA |
Operational conditions | |
Operating altitude | 0 - 3048 m |
Operating relative humidity (H-H) | 5 - 95% |
Storage temperature (T-T) | -25 - 65 °C |
Operating temperature (T-T) | -5 - 60 °C |
Non-operating altitude | 0 - 15240 m |
Packaging data | |
Package weight | 10 kg |
Package depth | 124 mm |
Package height | 2040 mm |
Package width | 165 mm |
Certificates | |
Certification | CUL , FCC 15 A, ICES-003, PSE |
Compliance certificates | RoHS |
Packaging content | |
Manual | ![]() |
Design | |
Type | Single-phase |
Product colour | Black |
Mounting | Vertical |
Rack capacity | 0U |
PDU types | Switched |
Sustainability | |
Sustainability compliance | ![]() |
EAN | 0731304356264 |
Warranty | 1 year |
Source: Icecat.biz |
The APC Switched Rack PDU distributes reliable power within a rack through a single input and multiple output receptacles The APDU9941 offers advanced load management combined with remote on/off switching control of individual outlets for power cycling, delayed power sequencing, and outlet use management The 0U PDU includes a NEMA L6-30P input plug with 3 05m (10 ft) cord, (21) IEC 60320 C13/C15 and (3) IEC 60320 C19/C21 hybrid outlet receptacles The hybrid outlets allow 60°C operating temperature at full load, are compatible with standard C14 and C20 power cords, and are future-proofed for new C16 and C21 power cords required for higher temperature rated devices The Network Management Card provides enhanced cybersecurity with secured interfaces and modified password policy The rack PDU integrates with EcoStruxure IT through Network Management Card and can be accessed, configured, and managed remotely via Web, SNMP and Command Line Interface Color user-interactive LCD interface details current, real power, voltage, and energy measurements for local user access The outlet level control allows power on/off functionality for power recycling/reboot of remote equipment and restricts unauthorized use of individual outlets The Switched Rack PDU includes a temperature/humidity sensor port, locking IEC outlets when used with locking power cords, low-profile circuit breakers and USB port for local Firmware updates The rack PDU supports daisy-chain of up to 32 PDUs on a single IP address, thereby reducing networking cost The rack PDU comes with a standard three-year warranty
Multitronic Vaasa: 0 pcs
Estimated delivery: 09.10 - 12.10
Estimated delivery: 09.10 - 12.10
Today: 10:00 - 18:00
Multitronic Pietarsaari: 0 pcs
Estimated delivery: 09.10 - 12.10
Estimated delivery: 09.10 - 12.10
Today: 09:00 - 17:00
Multitronic Jyväskylä: 0 pcs
Estimated delivery: 09.10 - 12.10
Estimated delivery: 09.10 - 12.10
Today: 10:00 - 17:00
Multitronic Lappeenranta: 0 pcs
Estimated delivery: 09.10 - 12.10
Estimated delivery: 09.10 - 12.10
Today: 10:00 - 18:00
Multitronic Mariehamn: 0 pcs
Estimated delivery: 09.10 - 12.10
Estimated delivery: 09.10 - 12.10
Today: 10:00 - 18:00
Fetch from the shop
Estimated delivery time: 09.10 - 12.10
Estimated delivery time: 09.10 - 12.10
Matkahuolto: Parcel lockers and service points
Estimated delivery time: 10.10 - 12.10
Estimated delivery time: 10.10 - 12.10
Posti: Parcel lockers and service points
Estimated delivery time: 09.10 - 11.10
Estimated delivery time: 09.10 - 11.10
Posti: Postal package
Estimated delivery time: 10.10 - 12.10
Estimated delivery time: 10.10 - 12.10
Posti: Doorstep delivery
Estimated delivery time: 10.10 - 11.10
Estimated delivery time: 10.10 - 11.10
Posti: Home delivery
Estimated delivery time: 10.10 - 11.10
Estimated delivery time: 10.10 - 11.10
The above technical details are for reference only and may change without notice. We reserve the right to correct printing errors and use illustrations for guidance. Some text may be auto-generated or machine-translated, which could lead to inaccuracies.